We spent a couple of days repatching the theatre as the magic sheet didn't correspond to the channels that lights the were plugged into. The theatre was also a bit of a mess in terms of the way the cables were arranged.
Our tutor asked us to do a one-to-one patch in order to make it easier to use the lights in future shows.
Subscribe to:
Post Comments (Atom)
Royal Opera House Design Challenge
For the Royal Opera House Design Challenge I have decided to do Marketing Strategy and Design. My idea is to do a virtual tour of the Royal ...
-
We started learning about how to rig a PA system. We used an SM58 microphone, connected it into a pre-amp using an XLR cable, then we used a...
-
We spent a couple of days repatching the theatre as the magic sheet didn't correspond to the channels that lights the were plugged into....
-
During this lesson we looked at theatre during the Victorian Age as a way to do some research for the Christmas play that we're doing - ...
No comments:
Post a Comment